Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | EkkoFlex |
Certification : | ROHS,REACH |
Price : | $3.34-5.2/㎡ |
Payment Terms : | T/T, L/C |
Supply Ability : | 1000000m per month |
Delivery Time : | 7-14 work days |
Supercritical CO2 Foam PVDF Foam The Eco-Friendly Alternative to Traditional Foam
Green foaming process:Supercritical CO2 instead of traditional foam agent
A large number of micron bubbles are formed in the polymer material
Foam density:25kg/m3 to 100kg/m3,thickness more than 30mm;
Supercritical CO2 molding foam technology can be used in many types
of polymer, such as PP,POE,TPE,PA6 and so on
Our current lightweight foam materials:MPP,MTPU,M-PVDF:
1) All supercritical physical foaming, environmental protection
without odor;
2) No chemical residue
3) Closed cell structure,exquisite cells, nanoscale aperture
diameter
4) Light weight, high strength, high elasticity, excellent
mechanical properties;
5) Non crosslinked, can be recyclable.
Specification:
Test Item | Test method | Unit | PVDF05 |
Density | ISO845:2006 | g/cm³ | 0.045-0.07 |
Hardness | SATRA TM205-16 | shore C | 42 |
Tensile Strength (MPa) | ISO1798:2008 | MPa | 0.84 |
Elongation at Break (%) | ISO1798:2008 | % | 148 |
Shrinkage | ASTM D1148 | % | 3(120℃) |
compression rebound | ASTM D1148 (50% 22h) | % | 1.47(24h) |
Method A Tear Trouser Test (N/cm) | ISO8067:2008 | N/cm | / |
Method B Tear AngleTest (N/cm) | ISO8067:2008 | N/cm | 38.75 |
Ball Resilience (%) | ASTM D3574 | % | 50.5 |
Application:
Clean pipe Medical neck colla
FAQ:
Q1:How can I place an order?
1)Tell us the size details and quantity you want to order.
2)We will make PI for you.
3)Checking PI and confirm it for us, we will arrange the production
ASAP when the prepayment received.
4)We will take photos for you to confirm and then deliver the goods
soon after the balance.
5)Send the Customs Clearance Documents or tracking number to you
and track the goods for you until you get it.
Q2:How long is your production lead time?
1) Sample date will take be in 7 days
2)Mass production delivery date will be around 15-45 days,Depends
on the quantity.
Q3:Do you accept customized foam products ?
We have customized production service, we can produce foam products
as per client’s requests.
![]() |